August brought on many challenges. A break in our irrigation system occurred on August 27 (Sunday) and was repaired by September 1 (Friday). Thanks go to those who responded to the situation so quickly, particularly our Engineering Department (Steve Beditz and Steve Angle) and H2Mow, our contractors that surveyed the damage that Sunday afternoon. During this time the irrigation control software was replaced, and a water pressure reduction device was installed.
Another important development was the staining of the new maintenance shed, which provides shelter for our court equipment and materials. Thank you, Steve Beditz and Dave Motta, for your efforts in getting this done despite the weather. Also, a note of thanks goes to Gary Cimorelli for designing and installing the ramp to the shed.